Noble Energy

SUMP CAISSON LIFTING ON THE
ALEN CPP PLATFORM

  • Sling plan (in 3 points) and installation of lifting means
  • Design and construction of the Spreader bar
  • Design and construction of main winch and secondary winch supports.
  • Calculation note for slinging forces and the minimum tube thickness necessary for its resistance.
  • Calculation note for the Spreader bar
  • Calculation note for winches supports