Noble Energy SUMP CAISSON LIFTING ON THEALEN CPP PLATFORM Sling plan (in 3 points) and installation of lifting meansDesign and construction of the Spreader barDesign and construction of main winch and secondary winch supports.Calculation note for slinging forces and the minimum tube thickness necessary for its resistance.Calculation note for the Spreader barCalculation note for winches supports